How long is the permit valid?
A permit under which no work has commenced within 180 days after issuance shall expire and become null and void. Please refer to...
A permit under which no work has commenced within 180 days after issuance shall expire and become null and void. Please refer to...
The ground snow load (PG) is 35 pounds per square foot (PSF) per the Maryland Code Administration. Design snow loads shall be...
The frost depth is 2 feet 6 inches from finished grade to the bottom of the footing.
The minimum requirements are:
- Provide a copy of complete architectural/structural plans for all residential construction...
The process is as follows:
- You need to complete the Application Form.
- You need to provide a site plan showing the location...
The requirements are:
- A permit is not required if your shed is less than 150 square feet.
- You need to complete the Application...
The process is:
- You need to complete the Application Form.
- You need to provide a copy of the basement floor plans. Please...
Please call Park and Planning (301-952-3208) for information.