If the sprinkler/fire alarm drawings are submitted separately by the vendor contractor, does any of the information need to be shown on the Tenant Fit-Out drawings?

Just information regarding existing/proposed fire protection systems should be included on the building permit drawing. A separate building permit needs to be obtained as per question #2.