How soon can a preopening or a site installation inspection be scheduled?

Our commitment is to schedule inspections to meet the needs of our clients and within the constraints of our work load. Normally, that would be within five business days. The plan reviewer who reviewed/approved your food or swimming pool plans will be your on-site inspector. Sewage disposal system installation inspections are made by our field inspector who can be reached at 301-883-7624.