Townhouse (Four or More Stories)

Applying

For applicable forms, visit Forms and Checklists.

The following are required when applying for a Townhouse Building Permit:

  • Seven (7) Site/Plot Plans -- Original Signature and Sealed

  • Two (2) Architectural Drawings -- Original Signature and Sealed

  • Two (2) Structural Drawings -- Original Signature and Sealed

  • Two (2) Electrical Drawings -- Original Signature and Sealed

  • Two (2) Mechanical Drawings -- Original Signature and Sealed

  • Two (2) Energy Calculations -- Original Signature and Sealed

  • Two (2) Landscape Plans -- Original Signature and Sealed

  • Two (2) Sediment Control Plans, one of which must be Green Stamped

  • Three (3) Type II Tree Conservation Plans, or Exempt Letter

  • Two (2) Approved Stormdrain Plans

  • One (1) Concept Approval Letter